Stainless Steel Lost Wax Casting Engine Auto Spare Motorcycle Parts Gear Wheel Pump Impeller

Standard Details

Surface area: Satin/Mirror/PVD/Plating
Certificate: ISO9001, RoHS, CE , CUPC
OEM/ODM: Accessible
Supply Port: HangZhou
Delivery Time: 30 to fifty times
Shipping CZPT: EXW,FOB,CIF,CFR

Item Specification

CZPT Casting Areas
Substance: CZPT steel, CZPT Metal
Method: Missing wax casting
Standard: GBT6414-1999
Casting Tolerance: CT6 Common
Excess weight: .1kg to 100kg
Product Assortment: CZPT, aviation, robot automation, machinery, resources, hardware, electronics, sanitary ware, pump valves, doorway locks and other stainless steel, carbon metal, alloy steel elements
Tooling manufactured by ourself – We have 2 CNC facilities
CZPT machining method – We have our own machining, welding, sprucing, testing workshops
 

Content Components
CZPT Composition of Substance Materials
Composition
201 202 304 316 430
C ≤0.fifteen ≤0.fifteen ≤0.08 ≤0.035 ≤0.12
Si ≤1.00 ≤1.00 ≤1.00 ≤1.00 ≤1.00
Mn five.5-seven.five 7.5-10 ≤2.00 ≤2.00 ≤1.00
P ≤0.06 ≤0.06 ≤0.045 ≤0.045 ≤0.040
S ≤0.03 ≤0.03 ≤0.030 ≤0.030 ≤0.030
Cr 13-fifteen 14-17 eighteen-twenty sixteen-eighteen sixteen-18
Ni .7-one.one 3.five-4.5 8-ten ten-twelve  
Mo       2.-3.  
CZPT House Material Product 201 202 304 316
Tensile CZPT ≥535 ≥520 ≥520 ≥520
Yield CZPT ≥245 ≥205 ≥205 ≥205
Extension ≥30% ≥30% ≥35% ≥35%
Hardness (HV) <105 <100 <90 <90

 

Rewards

1, With our own stainless metal investment decision casting generation strains and machining traces, give you 1-end services.

two, With CNC(CNC Middle), we make the tooling by ourselves. Make you easier.

3, With 50000 square meters workshop located in HangZhou metropolis, close to HangZhou port, transportation is hassle-free.

4, Use Germany Spectrometer and Salty Spray to test the raw content.

five, We have 15 engineers with powerful capability to style and produce new items.

six, With ISO 9001:2015, ISO 14001 and OHSAS 18001 program.

seven, With the ERP program, We can give you the generation and supply of info for the first time. Also if any high quality difficulty, we can resource it and give you the resolution really quick.

8, CZPT reply inside 12 hrs.
 

Business Introduction

ABL was launched in 2008 by Kate Liang, started out from a four hundred square meters workshop.
In 2009, Supported by clients and suppliers, ABL moved to a 4000 square meter workshop and expand our company all in excess of the entire world.
In 2012, We have bought our merchandise to a lot more than 200 international locations, and our manufacturer existed
in much more than fifty nations around the world in the world.
In 2013, We have passed CUPC, NSF, CE and ROHS certificates,starting up entered into the CZPTean and CZPTican marketplaces.
In 2014, with the quick advancement, ABL moved to a 50000 square meters factory. We have our personal stainless steel expenditure casting creation lines and also concluded machining types of products.
In 2015, We set up our management staff. We have cooperated with some universities and receiving bigger. At the identical time, we are also Alibaba instruction center.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001certificate. we have previously cooperated with some top 500 enterprises.
2018, ABL target a lot more on Lean Generation and preparing for the next five years.
2019, We are likely to develop a screening center and obtain a increased product sales goal.
 

Generation Process

Steps Time
Tooling Generating CNC Middle seven days

Casting Method

Wax Injection two days
Sand Shell Molding five days
Dewaxing one times
Pouring one days
Chopping 1 times
Grinding one times
Cleaning 1 days

Machining Approach

CNC 2 times
Drilling & Tapping 2 days
Welding 2 days
Stamping 1 days
Sharpening five times
Assembling CZPTsonic Washing one times
Water Tests one days
Assembling 2 days
Remark: The generation time base on CZPT quantity and method

Our mission
To change the world’s check out about Chinese solution.
To be the leader in the precision casting industry

Our aspiration

  1. To achieve Get-earn achievement with all of our clients and supplies
  2. To be an worldwide CZPT manufacturer.
  3. To be a one particular-hundred-calendar year company

Soon after-revenue Services

  1. Reply you quick inside of twelve hrs.
  2. Have an individual to adhere to up all your inquiry and buy.
  3. We will offer you content top quality and prices to you.

FAQ

1, The place is your factory?

Our manufacturing facility located in HangZhou Town, ZheJiang CZPT. Factory 50000 sq. meters with 265 personnel.

two, What is your payment phrase?

We do T/T, thirty% deposit, stability prior to supply. We can also accept L/C.

three, What is the production time?

Casting element need to have 20 to thirty times.
Balustrade and handrail components need twenty five to 35 days.
Faucet and shower want 40 to sixty times.

4, Is that achievable to check out the factory?

Certain, we sincerely welcome you to check out our manufacturing facility, we can also decide you from the resort.

Stainless Steel Lost Wax Casting Engine Auto Spare Motorcycle Parts Gear Wheel Pump Impeller