Rubber Lined Am  Horizontal Slurry Pump

CZPT Lined Am (R) Horizontal Slurry Pump

CZPT for Centrifugal Double Casing Gold CZPT 2-1.5 Slurry Pump
An pump equipment has total knowledge of slurry pump answer, design and production.
AM collection Centrifugal double casing gold mining 2-one.5 slurry pump is horizontal, cantilevered centrifugal slurry pump, with affordable construction, trustworthy procedure, extended services daily life. It is extensively utilized in transporting abrasive or / and corrosive slurry in mining, metallurgy, electrical electrical power, coal, chemicals, constructing, and so on. Specially properly accepted by coal / chrome washing plant, mineral processing plant, energy plant and many others. 

Structural Attributes about Centrifugal Double Casing Gold CZPT two-1.5 Slurry Pump
     – One phase, solitary suction, horizontal centrifugal slurry pump
     – Damp parts these kinds of as casing, impeller, liner plate in anti-abrasion substantial chrome solid iron alloy.
     – Horizontal-central-split container bracket straightforward for maintaining 
     – Packing or mechanical seal
     – Protective shell surrounding the casing ideal for large duty
     – CZPT optimization design, high-efficient, power-saving and steady procedure

Application of Centrifugal double casing gold mining 2-1.5 slurry pump
Weighty obligation CZPT Approach     Coal Preparing Plant
Cyclone Feeds                        CZPT Processing
Tailings                                    Mill Grinding
Slurry Feeding Method            Heavy Refuse Removal
Pulp And Paper                       Dredging
CZPT Slurry                        High Density Slurries
Ash Managing                           CZPT Processing

Centrifugal double casing gold mining 2-1.5 slurry pump performance:

Product Max Electrical power
(kw)
Material Very clear h2o functionality Impeller
Vane No.
Liner Impeller Capability Q
 ( m3/h)
Head 
H ( m)
Speed 
n (rpm)
one.five/1B-AM fifteen M M twelve.six~28.eight 6~sixty eight 1200~3800 five
RU RU ten.8~25.two seven~fifty two 1400~3400 three
1.five/1B-AMH thirty M M sixteen.2~34.two twenty five~92 1400~2200 5
two/one.5B-AM fifteen M M 32.four~seventy two 6~58 1200~3200 five
RU RU twenty five.two~fifty four 5.five~forty one 1000~2600
three/2C-AM thirty M M 39.six~86.4 12~64 1300~2700 5
RU RU 36~75.6 13~39 1300~2100
4/3C-AM 30 M M 86.four~198 nine~fifty two 1000~2200 5
four/3D-AM sixty
4/3C-AM 30 RU RU 79.two~one hundred eighty 5~34.five 800~1800 five
4/3D-AM 60
four/3E-AMH one hundred twenty M M 126~252 12~97 600~1400 5
6/4D-AM 60 M M 162~360 twelve~fifty six 800~1550 5
six/4E-AM one hundred twenty
six/4D-AM sixty RU RU one hundred forty four~324 twelve~forty five 800~1350 5
6/4E-AM 120
six/4F-AMH 260 M M one hundred~414 34~ninety eight 600~1000 5
8/6E-AM a hundred and twenty M M 360~828 10~61 five hundred~1140 5
8/6E-AM 120 RU RU 324~720 7~forty nine 400~a thousand 5
10/8ST-AM 560 M M 612~1368 eleven~sixty one 400~850 5
RU RU 540~1188 twelve~50 four hundred~750
ten/8E-MM 120 M M 666~1440 14~sixty 600~1100 five
ten/8E-MM 120 RU RU 540~1188 10~42 500~900 five
twelve/10ST-AM 560 M M 936~1980 7~sixty eight 300~800 five
M M 720~1620 seven~45 300~650
fourteen/12ST-AM 560 M M 1260~2772 thirteen~sixty three three hundred~600 5
RU RU 1152~2520 thirteen~44 three hundred~500
16/14ST-AM 560 M M 1368~3060 11~sixty three 250~550 five
16/14TU-AM 1200
eighteen/16ST-AM 560 M M 2160~5040 eight~sixty six 200~500 5
18/16TU-AM 1200
twenty/18TU-AM 1200 M M 2520~5400 13~57 two hundred~four hundred five

CZPT of Large Responsibility Large Stress CZPT Metal Lined Sludge Slurry Pump

CZPT types about Heavy Obligation Higher Force CZPT Metal Lined Sludge Slurry Pump

Curves chart about Heavy Responsibility Higher Strain CZPT Metallic Lined Sludge Slurry Pump

RFQ about Heavy Responsibility Higher Pressure CZPT Metal Lined Sludge Slurry Pump

Ideas for slurry pump installation

 Please take observe as beneath when put in the slurry pump:

one. The preformed gap on the foundation must be poured as the pump installation drawing.

2. The set up stage must satisfy the demand from customers of the allowed vacuum suction height. The basis should be in horizontal and stable condition, to make confident the rotation of the driver machinery identical with the pump in the direction.

3. When join by coupling, need to make certain the pump and driver shaft center  should be in a straight line.

4. If belt connection, the shaft center must be in parallel.

5. The slurry pump suction pipe need to be sealed effectively, and attempt to much less the quantity of the elbow and check valve. When fill water, exhausted the air. It should be no any air when operate. We need to have to hold the suction pipe slopes up slightly, and then connect with the pump inlet.

Contact Us 

 

 

Rubber Lined Am  Horizontal Slurry Pump